plymouth Workshop Repair Guides

Plymouth Workshop Service and Repair Manuals

Clutch Control Valve <--> [Torque Converter Clutch Solenoid, A/T] > < A/T - 41TE/42LE Shudder During EMCC Shift|Page 4156
Page 1
background image

Torque Converter Clutch: Service and Repair

Notes:

A lock-up clutch break-in program is being used in the Imperial and 5th Avenue (AY body) models. This process will eliminate shudder during
partial lock-up on a new torque converter, if done properly.

If the torque converter is replaced, the new clutch within the torque converter will require break-in. 

The current break-in status stored in the EATX controller will have to be reset to the start of break-in with the DRBII.

If a new EATX controller is put on the vehicle, the status will be at the start of break-in. This status is acceptable regardless of the mileage on
the torque converter. No modification of the break-in status is required.

To properly service these vehicles, it is necessary to use a DRBII (or equivalent scan tool), to read or reset the break-in status. 

Procedure - Perform the following steps with the scan tool, to reset the break-in status.

1.

Plug the DRBII into the blue COD Bus connector. The connector is located under the instrument panel on the driver's side of the vehicle.

2.

Insert the proper cartridge into the scan tool.

3.

Using scan tool - Select "System".

4.

Select - "Transmission".

5.

Actuate tests (follow scan tool manufacturer's instructions), for the following.

-

Bus Test

-

Initialize

-

Controller Part Number

6.

Select - Adjustments.

7.

Reset LU Clutch). (follow scan tool manufacturer's instructions). You should now see one of the following screens:

(a)

LU Clutch Break-in Status: Start

(b) LU Clutch Break-in Status: In-progress Press ENTER to Reset Break-in status

(c)

LU Clutch Break-in Status: Complete Press ENTER to Reset Break-in status

8.

Follow the instructions for the screen displayed.

-

If screen (a) appears, the controller is at the beginning of its break-in program. No further action is required.

-

If screen (b) appears, the controller is in the middle of its break-in program. Press the enter key on the DRBII key pad to return the status to the
start of break-in.

-

If screen (c) appears, the controller has completed its break-in status program. Press the enter key on the DRBII key pad to return the status to
the start of break-in.

Clutch Control Valve <--> [Torque Converter Clutch Solenoid, A/T] > < A/T - 41TE/42LE Shudder During EMCC Shift|Page 4156