plymouth Workshop Repair Guides

Plymouth Workshop Service and Repair Manuals

Procedures|Page 5806 > < Procedures|Page 5804
Page 7
background image

Fig. 13

14. Install screws to hold the patch to support squares (Fig. 13). Tighten screws until patch surface is flush with panel surface.
15. Allow epoxy to cure, and remove all screws.

Fig. 14

16. Using a 125 mm (5 in.) 24 grit disc grinder, grind a 50 mm (2 in.) to 75 mm (3 in.) wide and 2 mm (0.080 in.) deep path across the gaps around

the patch (Fig. 14). With compressed air, blow dust from around patch.

Procedures|Page 5806 > < Procedures|Page 5804