pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Sensors and Switches - HVAC > < Blower Control Module|Page 8726
Page 2
background image

-

Let PCM hang, leave wires attached.

2. Vacuum and side electrical connector from programmer.
3. Temperature valve link rod.

-

Reach up through PCM bracket to gain access to rod.

4. Programmer attaching screws.
5. Temperature valve actuator connector.

-

Reach up through PCM bracket to gain access to connector.

6. Programmer.

Install or Connect

1. Programmer in position.
2. Temperature valve actuator connector.

-

Reach up through PCM bracket to gain access to connector.

3. Programmer attaching screws.

Tighten

-

Screws to 1.4 N.m (12 lb. in.).

4. Electrical and vacuum connectors.
5. Temperature valve link rod to air mix valve.

Adjust

-Temperature valve link rod after installation, refer to "Temperature Valve Link Adjustment". See: Air Door/Air Door Actuator /
Motor/Adjustments

6. PCM to bracket.

-Enable SIR system. See: Body and Frame/Interior Moulding / Trim/Dash Board / Instrument Panel/Air Bag(s) Arming and Disarming

Sensors and Switches - HVAC > < Blower Control Module|Page 8726