pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Secondary Air Injection (AIR) Shut-Off Valve Outlet Pipe/Hose Replacement - Bank 1|Page 3612 > < Air Injection Check Valve|Diagrams
Page 1
background image

Air Injection Control Valve: Service and Repair
Secondary Air Injection (AIR) Shut-Off Valve Outlet Pipe/Hose Replacement - Bank 1

SECONDARY AIR INJECTION (AIR) SHUT-OFF VALVE OUTLET PIPE/HOSE REPLACEMENT - BANK 1

REMOVAL PROCEDURE

1. Remove the bank 1 secondary air injection (AIR) shut-off valve.
2. Remove the 2 nuts securing the shut-off valve to the bank 1 AIR outlet pipe.
3. Remove the bank 1 AIR outlet pipe.

INSTALLATION PROCEDURE

1. Install the bank 1 AIR outlet pipe and new gasket to the bank 1 AIR shut-off valve.
2. Install the 2 nuts securing the bank 1 AIR outlet pipe to the bank 1 AIR shut-off valve.

NOTE:  Refer to Fastener Notice in Service Precautions.

Tighten the 2 nuts to 9 N.m (80 lb in).

3. Install the bank 1 AIR shut-off valve.

Secondary Air Injection (AIR) Shut-Off Valve Outlet Pipe/Hose Replacement - Bank 1|Page 3612 > < Air Injection Check Valve|Diagrams