pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Deployment Procedures|Page 7326 > < Deployment Procedures|Page 7324
Page 11
background image

7. Cut the yellow harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
8. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

9. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the driver deployment

harness.

10. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
11. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the inflator module.

12. Twist together 2 connector wire leads (the high circuits from both stages of the steering wheel module) to one set of deployment wires. Refer to

SIR Connector End Views in order to determine the correct circuits.

13. Inspect that the 3 wire connection is secure.

Deployment Procedures|Page 7326 > < Deployment Procedures|Page 7324