pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Relay Box > < Diagram Information and Instructions|Page 3855
Page 5
background image

4. Install the electrical center connector cover.
5. Turn the electrical center right side up.
6. Install the electrical center to the battery tray by pushing the electrical center into the retainer tab.
7. Install all of the fuses and the relays.
8. Install the positive battery cable lead to the stud on underhood electrical center, then install the positive battery cable lead retaining nut.

Tighten the positive battery cable lead retaining nut to 10 N.m (89 lb in).

9. Install the electrical center cover.

10. Install the battery. 

Relay Box > < Diagram Information and Instructions|Page 3855