G6 V6-3.5L (2009)
Tighten the bolts to 40 Nm (30 lb ft).
3. Install the electrical connection to the battery terminal on the solenoid.
Tighten the battery terminal nut to 17 Nm (13 lb ft).
4. Install the electrical connections to the S terminal on the solenoid.
Tighten solenoid S terminal nut to 3 Nm (27 lb in).
5. Install the flywheel inspection cover.
6. Install the flywheel inspection cover bolts.
Tighten the flywheel inspection cover bolts to 10 Nm (89 lb in).
7. Lower vehicle.
8. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (See: Battery/Battery Cable/Service and
Repair).