G6 V6-3.9L (2009)
3. Connect the HO2S (4) electrical connector.
4. Install the CPA retainer (3).
5. Install the HO2S clip to the oil level indicator tube bracket.
3. Connect the HO2S (4) electrical connector.
4. Install the CPA retainer (3).
5. Install the HO2S clip to the oil level indicator tube bracket.