pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Relays and Modules - Powertrain Management > < Underhood|Page 516
Page 5
background image

5. Install the positive battery cable lead (1) to the stud on the BEC. Install the positive cable lead nut to the stud.

Tighten
Tighten the nut to 16 N..m (12 lb.ft).

6. Close the cover (2) on the BEC.
7. Connect the negative battery cable.

Relays and Modules - Powertrain Management > < Underhood|Page 516