Grand Prix V8-5.3L (2007)
14. Bend flat the twisted connection.
15. Secure and insulate the 3 wire connection to deployment harness using electrical tape.
16. Twist together two connector wire leads (the low circuits from both stages of the steering wheel module) to one sets of deployment wires. Refer to
SIR Connector End Views in order to determine the correct circuits.
17. Inspect that the 3 wire connection is secure.
18. Bend flat the twisted connection.
19. Secure and insulate the 3 wire connection to deployment harness using electrical tape.
20. Connect the deployment harness to the steering wheel module in-line connector.