pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Negative, Battery Cable|Service and Repair|Page 12446 > < Negative, Battery Cable|Service and Repair|Page 12444
Page 5
background image

13. Install the battery cable harness retaining clips (1, 4, and 5) to the front rail and fan shroud.
14. Lower the vehicle.
15. Position the wire (2) to the top rail, and install the ground wire bolt (3).

Tighten the bolt to 10 N.m (89 lb in).

16. Install the BEC to the strut tower.
17. Install the positive battery lead terminal (2) to the BEC.
18. Install the positive battery cable junction block lead nut (1).

Tighten the nut to 10 N.m (89 lb in).

19. Install the positive battery cable junction block cover.

Negative, Battery Cable|Service and Repair|Page 12446 > < Negative, Battery Cable|Service and Repair|Page 12444