GTO V8-6.0L VIN U (2005)
15. Continue to tighten the plenum chamber screws.
Tighten
Tighten the plenum chamber screws to 25 N.m (18 lb ft).
16. Wipe any excess adhesive from the plenum drain hole (1), each side, and the glue track areas (2).
17. Apply the sealers and anti-corrosion materials to the repair area, as necessary. Refer to Anti-Corrosion Treatment and Repair.
18. Paint the repaired area.
19. Install the body earth ground strap (1) and the 2 screws (2).
Tighten
Tighten the ground strap screws to 3 N.m (27 lb in).
20. Install all of the related panels and components.
21. Connect the negative battery cable
22. Enable the SIR system. Refer to SIR Disabling and Enabling Zones in SIR.