GTO V8-6.0L VIN U (2005)
IMPORTANT: Ensure the wiring harness ground lead (3) is installed under the left rear SDM (1) retaining bolt.
Tighten the fasteners to 9 N.m (80 lb in).
3. Install the SDM electrical connector.
4. Install the center console.
5. Enable the SIR system. Refer to SIR Disabling and Enabling Zone 8.