Montana SV6 V6-3.9L (2007)
Notice: Refer to Fastener Notice.
3. Install the CKP sensor stud (2).
Tighten the stud to 10 N.m (89 lb in).
4. Connect the engine harness electrical connector to the CKP sensor.
5. Install the exhaust manifold.
Notice: Refer to Fastener Notice.
3. Install the CKP sensor stud (2).
Tighten the stud to 10 N.m (89 lb in).
4. Connect the engine harness electrical connector to the CKP sensor.
5. Install the exhaust manifold.