Vibe L4-1.8L VIN L (2003)
1. Install the lower air distribution duct (2) to the HVAC module assembly.
2. Connect the lower air distribution duct to the defroster duct.
3. Secure the lower air distribution duct with the four push clips (1).
4. Install the upper air distribution duct (2) to the upper IP panel (5). Secure with the four screws (1)
5. Install the upper IP assembly.