pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Deployment Procedures|Page 5591 > < Deployment Procedures|Page 5589
Page 7
background image

9. Clear a space on the ground about 1.85 m (6 ft) in diameter for deployment of the module. If possible, use a paved, outdoor location free of

activity. Otherwise, use a space free of activity on the shop floor. Make sure you have sufficient ventilation.

10. Make sure no loose or flammable objects are in the area.
11. Place the J 39401-B in the center of the cleared area.
12. Fill the fixture plastic reservoir with water or sand.

IMPORTANT:  Securely hand tighten all fasteners prior to deployment.

13. Mount the module in the SIR deployment fixture with the vinyl trim cover facing up using one of the following mounting methods.

14. To use the stud mount method, remove the original mounting nuts.
15. Use the J 39401-1 mounting nuts (3) in order to secure the module (1) to the fixture (2).

Deployment Procedures|Page 5591 > < Deployment Procedures|Page 5589