Vibe FWD L4-1.8L VIN L (2005)
Manifold Pressure/Vacuum Sensor: Service and Repair
SECONDARY AIR INJECTION PRESSURE SENSOR REPLACEMENT
REMOVAL PROCEDURE
1. Disconnect the electrical connector (1) from the secondary air injection (AIR) pressure sensor (2).
2. Remove the 2 fasteners of the AIR pressure sensor (2).
3. Remove the AIR pressure sensor (2) from the shut-off valve (3).
INSTALLATION PROCEDURE
1. Install the AIR pressure sensor (2) to the shut-off valve (3).
2. Secure the AIR pressure sensor with 2 fasteners.
NOTE: Refer to Fastener Notice in Service Precautions.
Tighten the 2 fasteners to 5 N.m (44 lb in).
3. Connect the electrical connector (1) to the AIR pressure sensor (2).