pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Air Injection Control Valve > < Air Injection Vacuum Control Solenoid Valve|Locations|Page 2794
Page 1
background image

Air Injection Vacuum Control Solenoid Valve: Service and Repair

SECONDARY AIR INJECTION (AIR) SOLENOID VALVE REPLACEMENT

REMOVAL PROCEDURE

1. Disconnect the electrical connector from the secondary air injection (AIR) solenoid valve.
2. Disconnect the 2 vacuum hoses (3) from the AIR solenoid valve (3).
3. Remove the fastener (1) from the AIR solenoid valve (2).
4. Remove the AIR solenoid valve (2) from the intake manifold.

INSTALLATION PROCEDURE

1. Install the AIR solenoid valve (2) to the intake manifold with the one fastener (1).
2. Tighten the AIR solenoid valve fastener (1).

NOTE:  Refer to Fastener Notice in Service Precautions.

Tighten the fastener to 8.8 N.m (77 lb in).

3. Connect the vacuum hoses (3) to the secondary AIR solenoid valve (2).
4. Connect the electrical connector to the AIR solenoid valve.

Air Injection Control Valve > < Air Injection Vacuum Control Solenoid Valve|Locations|Page 2794