pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Deployment Procedures|Page 5473 > < Deployment Procedures|Page 5471
Page 2
background image

-

Fill the deployment fixture with water or sand.

-

Using the proper nuts and bolts, mount the IPM (1) to the deployment fixture (2), with the vinyl trim facing up.

-

Securely tighten all fasteners that hold the IPM (1) to the deployment fixture (2).

10. If you have a side impact module, refer to the following instructions:

-

Place the J 39401-B (3) in the center of the cleared area.

-

Fill the deployment fixture with water or sand.

-

Using the proper nuts and mount the side impact module (1) to the deployment fixture (3), with the vinyl trim facing up.

-

Adjust and secure the fixture arms (4) to the deployment fixture (3).

-

Securely tighten all fasteners that hold the side impact module (1) to the deployment fixture (3).

11. If you have a roof rail module, refer to the following instructions:

-

Place the J 39401-B (3) in the center of the cleared area.

-

Fill the deployment fixture with water or sand.

-

Using the proper nuts (2) and mount the roof rail module (1) to the deployment fixture (3), with the vinyl face up.

-

Adjust and secure the fixture arms (4) to the deployment fixture (3).

-

Securely tighten all fasteners that hold the side impact module (1) to the deployment fixture (3).

12. Inspect the J 38826 SIR Deployment Harness and the appropriate pigtail adapter for damage. Replace as needed.
13. Short the 2 SIR deployment harness leads (1) together using one banana plug seated into the other.
14. Connect the appropriate pigtail adapter (2) to the SIR deployment harness (1).

15. Extend the SIR deployment harness and adapter to full length from the deployment fixture.

Deployment Procedures|Page 5473 > < Deployment Procedures|Page 5471