pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Deployment Procedures|Page 5498 > < Deployment Procedures|Page 5496
Page 19
background image

82. Disconnect the right/passenger roof rail air bag yellow harness connector (2) from the roof rail module (1).

83. Cut the harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
84. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

85. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the roof rail 

air bag deployment harness.

86. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
87. Twist together one end from each of the wires in order to short the wires.

88. Twist together one connector wire lead to one deployment wire.

89. Bend flat the twisted connection.
90. Secure and insulate the connection using electrical tape.

Deployment Procedures|Page 5498 > < Deployment Procedures|Page 5496