Vibe FWD L4-2.4L (2009)
4. With the vent port (3) closed, blow 1.10 kPa (0.16 psi) of air into the air inlet port (2), and check that air flows from the purge port (1). If the
result is not as specified, replace the charcoal canister assembly.
5. Check for air leakage.