porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Firewall|Service and Repair|Page 5613 > < Firewall|Service and Repair|Page 5611
Page 9
background image

2. Punching holes for plug welding using inert gas.

2.1. Punch holes (Dia. = 7 mm) in areas -A- and -B- for plug welding using inert gas. Maintain spacing between the bores as on the old part.

3. Cleaning the welding areas.

3.1. Grind both sides of the connecting flanges of the front panel in the marked areas -A, B, C, D, E- until bare using a rotary brush.

4. Cleaning the welding areas.

4.1. Grind both sides of the connecting flanges of the front panel in the marked areas -A, B, C, D- until bare using a rotary brush.

Firewall|Service and Repair|Page 5613 > < Firewall|Service and Repair|Page 5611