porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removal and Replacement|Page 1216 > < Removal and Replacement|Page 1214
Page 30
background image

Note:  Do not interchange the thrust bearings of the inlet and exhaust camshafts during assembly; observe identification markings.

29. Insert three thrust bearings and one housing -arrows- for the bearing sleeve of the camshafts together with the guide rail for the timing chain.

30. Insert eight housing screws (Torx): six M6 x 35 -1- and two M6 x 40 -2- for camshaft bearing and guide rail. Tighten screws evenly and just

finger-tight.

Timing for side 1 - 3 

Note:  Position crankshaft above the pulley or vibration balancer before final adjustment of the timing to the TDC marking.

Note:  Before final tightening (torque angle) of the central screw, the special tool adjusting gauge 9686 must be removed.

31. Final timing adjustment for cylinder bank 1 - 3 is analogous to that for cylinder bank 4 - 6.

32. Fit chain tensioner for side 1 - 3 (hexagon a/f 32) before turning crankshaft to the TDC mark. Fit chain tensioner with new sealing ring and tighten.

Tightening torque 59 ft. lbs.

After adjusting the timing, this should be re-checked. 

Removal and Replacement|Page 1216 > < Removal and Replacement|Page 1214