porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Camshaft, Adjusting Timing - Engine Removed|Page 1142 > < Removing and Installing Camshaft, Adjusting Timing - Engine Removed|Page 1140
Page 8
background image

7. Remove chain tensioner for cylinders 1 -3 or -6.
8. Cylinder bank - 6 Unscrew guide rail screw M6 on pulley side (hexagon socket a/f 5).
9. Turn the engine at the assembly support so that cylinder bank to be worked on stands vertically upwards.

10. Unscrew four Torx screws for exhaust camshaft sprocket. Lift timing chain off sprocket and remove the sprocket. Lay timing chain on the

mounting tab for the sprocket.

11. Remove the four camshaft thrust bearings and the guide rail. Unscrew eight Torx screws, six M6 35, two M6 40 (screws for guide rail). Lift the

thrust bearing and the guide rail carefully off the mounting points or timing chain.

12. Remove the camshafts. Remove exhaust camshaft, lift timing chain off the camshaft adjuster of the inlet camshaft and remove the camshaft. Lay

the timing chain in the chain housing in the cylinder head.

Installing camshafts, adjusting timing - engine removed 

ATTENTION: Risk of damage due to particles of dirt.
^

Oil bores/oil ducts can become blocked up.

^

When working on the engine, absolute cleanliness is essential.

^

Lay removed engine parts on a clean base and cover them without fail.

^

Use the cover for dust protection when fitting the engine NR.165 on the engine assembly support. 

Identification of housings of camshafts:

^

Inlet camshaft:

^

Thrust bearing: "E" and matching number on cylinder head/cylinder head cover

Removing and Installing Camshaft, Adjusting Timing - Engine Removed|Page 1142 > < Removing and Installing Camshaft, Adjusting Timing - Engine Removed|Page 1140