porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Camshaft, Adjusting Timing - Engine Removed|Page 1150 > < Removing and Installing Camshaft, Adjusting Timing - Engine Removed|Page 1148
Page 16
background image

30. Insert eight housing screws (Torx): six M6 35 -1- and two M6 40 -2- for camshaft bearing and guide rail. Tighten screws evenly and just

finger-tight.

Timing for side 1 - 3 

Note: Position crankshaft above the pulley or vibration balancer before final adjustment of the timing to the TDC marking.

Note: Before final tightening (torque angle) of the central screw, the special tool adjusting gauge 9686 must be removed.

31. Final timing adjustment for cylinder bank 1 - 3 is analogous to that for cylinder bank - 6. 

32. Fit chain tensioner for side 1 -3 (hexagon a/f 32) before turning crankshaft to the TDC mark. Fit chain tensioner with new sealing ring and tighten.

Tightening Torque: 59 ft. lb.

After adjusting the timing, this should be re-checked. 

33. Turn the engine 360° at the crankshaft and fix at the TDC mark. Check camshaft position of cylinder bank -6 using the adjusting gauge 9686. Then

turn a further 360° and check the camshaft position of cylinder bank 1 - 3.

Subsequent work for installing camshafts 

Removing and Installing Camshaft, Adjusting Timing - Engine Removed|Page 1150 > < Removing and Installing Camshaft, Adjusting Timing - Engine Removed|Page 1148