porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 1284 > < Procedures|Page 1282
Page 8
background image

9. For the following steps, fasten the gear carrier to crankcase housing half 1-3 with two cylinder-head screws using spacer sleeves 9613. -

Tightening torque: 15 ft. lb. 

Removing pistons, side 4-6 

10. Lever off the front piston-pin circlips of marked pistons 4-6 (from the viewpoint of the drive belt side) using a small screwdriver, push out the

piston pin -arrow- and remove the pistons one by one. Assign the piston pins again to the appropriate pistons.

Removing pistons and connecting rods, side 1-3 

11. Remove marked pistons 1-3, including connecting rods. To do this, turn the crankshaft on the belt pulley/vibration balancer until the respective

connecting rod bearing cap stands upwards. Undo and remove the connecting rod bolts (twelve-edged socket wrench insert a/f 14), remove
connecting rod bearing cap.

Procedures|Page 1284 > < Procedures|Page 1282