porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 4260 > < Procedures|Page 4258
Page 4
background image

INFORMATION:
-

Before re-installing the component, check the O-rings of the refrigerant lines for damage and replaced them if necessary.

-

Wet the O-rings of the refrigerant lines with refrigerant oil.

-

Do not open the plugs for the lines and connections until shortly before installation.

-

Close off all lines and connections using suitable plugs during removal.

1. Lay the refrigerant line under the heat exchanger hoses and screw down on line to fluid tank -2- with fastening nut. - Tightening torque:20 Nm (15

ftlb.)

2. Clip line into the holder.

3. Position holder for refrigerant lines and secure with the fastening nut -1-. - Tightening torque: 6 Nm (4.5 ftlb.)

Subsequent work

Subsequent work line condenser-fluid tank

Installing battery.
Filling in refrigerant.
Installing cowl panel cover.

Removing and Installing Condenser-Condenser Line

Removing And Installing Condenser-condenser Line

Technical values

Preliminary work

Preliminary work for line condenser-condenser

Removing front apron.
Draining refrigerant.

Removing the condenser-condenser line

Procedures|Page 4260 > < Procedures|Page 4258