porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 3167 > < Procedures
Page 2
background image

Disconnecting Electrical Connections

4. Release and unplug the electrical connector -A-.
5. Unscrew fastening nut -B- for the B+ lead -4- and remove the B+ lead.

Installing three-phase generator

Installation Position

Connecting Electrical Connections

1. Place the three-phase generator on the engine and fit the B+ lead -4-, tightening with the fastening nut -B-. Tightening torque 11 ftlb..
2. Press in the electric plug until it clicks into place.

Positioning Three-phase Generator On The Engine

3. Insert the three-phase generator into the engine area -C-, then push upwards -B- and lift over the bracket -A-.

Screwing Down Vacuum Modulator

4. Position vacuum modulator over the three-phase generator and screw it down with the fastening screws -3-. Tightening torque 6.5 ftlb..

Procedures|Page 3167 > < Procedures