porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Power and Ground Distribution > < Procedures|Page 3456
Page 121
background image

2. Carry out work instructions after disconnecting the battery.

Subsequent work for wire harness for rear PASM

1. Fit carpet over the motor.

1.1. Lay the carpet over the motor and secure with the plastic clips.

2. Move convertible top from service position.
3. Carry out work instructions after disconnecting the battery.

Power and Ground Distribution > < Procedures|Page 3456