porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Telephone - Installation and Operation|Page 4863 > < Telephone - Installation and Operation|Page 4861
Page 4
background image

Wiring Installation

c. 928 S4 and 928 GT

Information:

Connect term. 30 (Battery positive) to battery plus pole, install inline fuse holder with 15A fuse.

From model year '90, connect term. 15 (Ignition) to CEB plug N24 (Figure 1) Fuse 43 -(7.5A). Prior to
model year '90, connect term. 15 to CEB plug N11 (Figure 2) fuse 9-7.5A.

Connect term. 31 (Ground) to ground point MP VII behind tool panel.

For additional information on component installation and wire routing refer to 928 Workshop Manual, Volume V, page 91-1 thru 91-9.

Telephone - Installation and Operation|Page 4863 > < Telephone - Installation and Operation|Page 4861