porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 5696 > < Procedures|Page 5694
Page 8
background image

10.1. Position tension cable eyelet -1- on the main folding top bow and secure with a fastening screw -2-. Tightening torque -] Tightening

torque: 7 Nm (5.0 ftlb.)

NOTE:  Cut-outs have been integrated to the right and left of the additional seal.

11. Secure hood covering at the tension bow.

11.1. Integrate the additional seal parallel to the tension strap -C- into the cut-outs on the right and left using a knife.
11.2. Press middle of tightening strip (notch marking) -A- into the lower groove on the tension bow -B- (centre of tension bow is indicated by a

hole) -A-.

11.3. The reference overlap seams of the hood covering must be positioned and centered in the additional seal -C- cut-outs on the left and right.
11.4. Secure the hood covering by tapping in the piping -D-.

12. Fit tension bow seal.

12.1. Press tension bow seal into the lower groove on the tension bow and secure at both ends with fastening screws. Tightening torque -] 

Tightening torque: 5 Nm (3.5 ftlb.)

13. Secure tension strap at the main folding top bow.

Procedures|Page 5696 > < Procedures|Page 5694