porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Ignition System > < Variable Induction Control Valve|Service and Repair|Page 2248
Page 3
background image

4. Press tuning pipe between the side rubber sleeves and align with the marking. Make sure that the rubber sleeves and screw-type hose clamps are

pushed equally onto the tuning pipe and intake distributors. Tighten screw-type hose clamps -arrows-.

5. Fit distributor pipe together with throttle body. To do this, push four screw-type hose clamps and the rubber sleeves onto the distributor pipe

-arrows-. Guide distributor pipe together with mounted throttle body between the intake distributors. Align and tighten the rubber sleeves
screw-type hose clamps.

6. Fit the crankcase ventilation line, cable plug and hexagon nut. - Tightening torque: 7.5 ftlb.

Subsequent work

Work subsequent to installing tuning pipe

1. Install air cleaner housing.
2. Connect the battery.

Ignition System > < Variable Induction Control Valve|Service and Repair|Page 2248