porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Cooling System|Capacity Specifications|Page 1384 > < Cooling System|Capacity Specifications|Page 1382
Page 5
background image

Information 
^

The bleeding process is completed more quickly if the canister is positioned at the same height as the coolant reservoir.

5. Push the filler hose of the vacuum pressure gauge -5- onto the canister connection. Draw off the return line -6- of the Venturi nozzle into a second

empty container.

Special canister filling tool

Information 
^

A hissing sound after connecting the compressed air supply is normal.

6. Connect the compressed air supply to the Venturi nozzle.

Compressed air supply on Venturi nozzle

7. Open both shut-off valves on the vacuum pressure gauge until the transparent filler hose has completely filled with coolant.

Shut-off valves open

8. Close left shut-off valve on the vacuum pressure gauge and allow a vacuum to build up in the coolant circuit.

Cooling System|Capacity Specifications|Page 1384 > < Cooling System|Capacity Specifications|Page 1382