911 Targa 4 (997) F6-3.6L (2010)
distributing piece -> Figure 16 -17-.
5.5 Fit the bent protective tube -> Figure 16 -13- on the vacuum line (280 mm) Figure 16 -26-.
5.6 Fit the bent protective tube -> Figure 16 -13- on the straight connection on the change-over valve -> Figure 16 -16-.
5.7 Clip the vacuum lines -> Figure 17 -arrows- into the cable duct.
6. Route vacuum lines (control lines).
6.1 Fit hose clips on the engine carrier -> Figure 18 -arrow-.
6.2 Cut three vacuum lines - measuring 60, 230 and 860 mm long - from the pipe provided (4 x 1 x 1,650 mm).
6.3 Assemble vacuum line set.
6. 3. 1 Fit vacuum line (60 mm) -> Figure 19 -21- and vacuum line (860 mm) -> Figure 19 -20- into the steel flexi-pipes -> Figure 19 -19-
and secure with a clamping sleeve -> Figure 20 -inset A-.
6. 3. 1 Push the vacuum lines (60 mm, 230 mm, 860 mm) Figure 19 -21, 25, 20- into the distributing piece -> Figure 19 -17-.
6. 3. 1 Slide hose clamps -> Figure 20 -inset B- onto the steel flexi-pipes.
6.4 Route vacuum line set.
INFORMATION: Illustration shows the installation position of the holder with engine removed.