porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Tune-up and Engine Performance Checks > < Variable Valve Timing Solenoid|Service and Repair|Page 1636
Page 4
background image

4. Install the plug coils. Place the adjacent plug coils on the spark plugs again. Tighten the two fastening screws to 10 Nm (7.5 ft. lbs.).
5. Install heat shield. Tighten the two fastening screws to 10 Nm (7.5 ft. lbs.).

6. Reinstall the shield of the exhaust system. Tighten the two fastening nuts on the side member for this purpose. 
7. Install charge air cooler. To do so, place the charge air cooler back in the vehicle. 

8. Tighten the front two fastening nuts and the fastening screw in the wheel well, all to 23 Nm (17 ft. lbs.). 
9. Tighten the front fastening nut and the fastening screw to 23 Nm (17 ft. lbs.). Supply the two hose connections on the charge air cooler with new

O-rings and fit them in place. The connections must audibly engage. 

10. Tighten the two sheetmetal nuts on the heat shield. 

Fit rear spoiler again. 

Tune-up and Engine Performance Checks > < Variable Valve Timing Solenoid|Service and Repair|Page 1636