porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 2502 > < Procedures|Page 2500
Page 6
background image

4. Reinstall cover panel. Insert the cover panel in the wheel well and tighten the seven fastening screws to 10 Nm (7.5 ft.lbs) 
5. Install charge air cooler. Move the charge air cooler back into installation position. Tighten the two rear fastening screws to 10 Nm (7.5 ft.lbs).

-

Tighten the three front fastening screws to 10 Nm (7.5 ft.lbs).

-

Then fasten the heat shield with two sheetmetal nuts.

Procedures|Page 2502 > < Procedures|Page 2500