porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Convertible Top Frame|Service and Repair|Page 4360 > < Convertible Top Frame|Service and Repair|Page 4358
Page 4
background image

10. Installing wedge

Position wedge -27- on the main bow -14- and tighten with the fastening screws -28-.

Tightening torque: 2.8 Nm (2.0 ftlb.)

11. Installing drive lever

Position drive lever -29- on the main bow -14- and secure the drive lever -29- with retaining clip -7- SLB 10.

Installing electrical wiring harness

1. Installing wiring harness on roof frame 1 and 3

a. Clip the fastened clips on the convertible-top wiring harness -30- into the holes provided on roof frame 1 -11- (clipped in 3 positions).
b. Clip the fastened clips on the wiring harness -30- into the holes provided on roof frame 3 -8- (clipped in 2 positions).

Dimension -inset X- up to model year 2001. Position angle on roof frame 3 and screw in with the fastening screws -33-. Fit rubber sleeve
-31aand plastic cover -31b- on the bracket -31-.

Tightening torque: 2.8 Nm

Dimension -inset Y- as of model year 2002. Position plastic bracket -32- on roof frame 3 and screw in with the fastening screws -33-.

Tightening torque: 2.8 Nm

Convertible Top Frame|Service and Repair|Page 4360 > < Convertible Top Frame|Service and Repair|Page 4358