porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Exhaust System > < Cooling System - Coolant Pump Replacement Criteria|Page 1196
Page 7
background image

^

Push on vacuum hose to the control valve.

^

Fix connector onto the temperature pressure sensor.

^

Fasten pressure pipe with 2 spring band clamps, 1 screw-type hose clamp and 3 hexagon-head bolts (a/f 10, 10 Nm (7.5 ft. lbs.)). 

17. Attach new O rings onto both pressure hoses and coat the O-rings and take-up bores on the pressure pipe with plenty of water.

18. Push the right and left pressure hoses into the pressure pipe, until they audibly engage. 
19. Make sure that the pressure hoses have been fitted correctly, by tipping and pulling on the pressure hoses.

20. Install air cleaner housing.
21. Fasten hot film mass air flow meter line:

^

Open omega clip on the left-hand side of the air cleaner housing,

^

Insert electrical line of the hot film mass air flow meter,

^

Close omega clip.

22. Connect battery.
23. Enter radio code.

Note:  
^

The cooling system is bled in connection with the Porsche System Tester 2.

^

Select special functions. Menu point.

24. Bleed the cooling system.

Exhaust System > < Cooling System - Coolant Pump Replacement Criteria|Page 1196