porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Cooling System Cleaned (Oil/Coolant Mixture)|Page 2040 > < Cooling System Cleaned (Oil/Coolant Mixture)|Page 2038
Page 7
background image

4. Connect the Venturi nozzle onto the vacuum pressure gauge.

Note! 
^

The radiator cleaning amount which is prepared must be approximately 2 liters more than the amount which has to be filled.

^

An anti-freeze content of -35°C corresponds to a mixture of 50:50 (anti-freeze protection: Water).

5. Place a canister with a sufficient amount of coolant and with an anti-freeze content of -35°C at rear of vehicle near to the expansion tank.

6. Push the filler hose (5) of the vacuum pressure gauge into the canister until the canister floor; guide the return line (6) of the Venturi nozzle into

the open.

Note!  A hissing sound after connecting the compressed air supply is usual.

7. Connect compressed air supply.

8. Open both shutoff valves on the vacuum pressure gauge until the transparent filler hose has completely filled with coolant.

Cooling System Cleaned (Oil/Coolant Mixture)|Page 2040 > < Cooling System Cleaned (Oil/Coolant Mixture)|Page 2038