porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Drain/ Refill|Page 1640 > < Drain/ Refill|Page 1638
Page 5
background image

15. If necessary, fill the coolant expansion tank with coolant up to the maximum marking and screw on the cap of the expansion tank (do not tilt).

 
Subsequent work 

1. Completely install rear underside panel.
2. Perform a test drive with the vehicle. Following the test drive and when the engine is still at operating temperature, accelerate briefly to greater

than 6,000 rpm a number of times at idle speed in order to fully ventilate the system.

3. Check the fluid level with the aid of the marks on the expansion tank. If necessary, correct the coolant level after the engine has cooled.

Drain/ Refill|Page 1640 > < Drain/ Refill|Page 1638