Boxster (987) F6-2.7L (2006)
6. Place gear carrier half on a clean surface, remove seven crankshaft bearing shells and three oil spray jets for piston cooling.
7. Lever out crankshaft with timing chain and place on a soft, clean surface.
8. Remove seven crankshaft bearing shells and oil spray jets for piston cooling from gearing carrier half 4-6. Unscrew gear carrier half from the
retaining device and place on a clean surface.
Installing crankshaft
Overview of connecting rod bearing position
1. Fit gearing carrier half 4-6 on special tool retaining device 9607 using two M10 x 25 hexagon-head bolts.
2. Ensure that the dowel sleeves are seated correctly in gear carrier half 4-6.
3. Insert three oil spray jets in the take-up bores in each of the gear carrier halves, press in gently to the stop using a plastic mandrel ([diameter] 4
mm).
4. Insert two thrust washers onto the center thrust block (no. 4) of gear carrier half 4-6; when doing so, the oil pockets -Arrows- must always point