Boxster (987) F6-2.7L (2006)
1. Push coolant hoses onto the heat exchanger and secure with the two fastening clamps.
2. Fit the two bottom spring-band clamps using the assembly tool for spring-band clamps NR.72.
Subsequent work
Subsequent work for heat exchanger hose
Installing battery.
Fill in coolant.
Install battery cover.
Carry out work instruction after disconnecting the battery.