porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 5791 > < Procedures|Page 5789
Page 16
background image

-

Position the tension strap -35- on the roof frame at the rear -22- and fasten the tension strap -35- with the fastening screws -38-.

Conversion Measure On The Tension Bow For The Tension Strap In Vehicles Produced Before 12.04.2000

NOTE:

-

Introduction on 13.04.2000 of a new convertible-top covering with modified rear window and wider tension strap for improved setting down of the
convertible-top covering.

-

In vehicles with production date up to 12,04.2000, the holes for the tension strap connection must be re-measured and re-drilled.

-

The rivet connection on the tension bow has changed from a 2-point to a 3-point rivet connection.

1. Measuring and drilling the rivet holes for the tension strap

-

Measure the dimensions -A = 10 mm- centrally starting from the old rivet holes -X- of the tension bow on the left and right.

-

Measure the dimension -B = 30 mm- centrally starting from the measured dimension -A- of the tension bow on the left and right.

-

Centre the measured dimensions using a prick punch. Drill the centrings with a drill bit dia. 5 mm.

Conversion Measure On The Tension Bow For The Roof Liner In Vehicles Produced Before 12.04.2000

NOTE:

-

In vehicles with a roof liner produced before 12.04.2000, a modified roof liner with a new cut must be installed when the convertible-top covering
with a small rear window is replaced

-

In vehicles with production date up to 12.04.2000, the holes for the roof liner connection must be re-measured and re-drilled.

-

The roof liner connection on the tension bow has been modified from a 1-point clip (threaded part) to a 2-point clip

1. Measuring and drilling the holes for the roof liner

Procedures|Page 5791 > < Procedures|Page 5789