porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Valve Tappets - Engine Removed|Page 1242 > < Valve Tappets - Engine Removed|Page 1240
Page 9
background image

Removing valve tappets of cylinder bank 4 - 6 

1. Remove fixing pin. 

Turn crankshaft clockwise until the bore 1 OT (top dead center) in the pulley is aligned with the fixing bore on the crankcase. Position or fix with
fixing pin (short) of special tool 9595.

2. Check camshaft adjustment at cylinder bank 4 - 6: 

The groove in the camshaft must face inward toward the crankcase.

3. Turn engine by 90° on assembly support until cylinder bank 4 - 6 faces upwards.

4. Unscrew chain tensioner of cylinder bank 4 - 6.

5. Remove closure cap from tensioning element (VarioCam). Hexagon-head bolts M6 x 20 (2 ea.).

6. Remove cylinder-head cover. Loosen hexagon-head bolts from the outside to the inside.

Valve Tappets - Engine Removed|Page 1242 > < Valve Tappets - Engine Removed|Page 1240