Cayenne (9PA) V6-3.2L (2006)
27. Fasten electric lines to starter.
27.1. Attach line to threaded bolt -Arrow A- and secure with fastening nut -4-. Tightening torque: 4.5 ftlb.
27.2. Connect the line to the B+connection -Arrow B- and secure with the fastening nut -3-. Tightening torque: 11 ftlb.
27.3. Place protection cap on the B+connection -Arrow C-.
28. Fit protection cap on starter.
28.1. Place heat shield around solenoid switch -Arrows A- and fasten with the snap fasteners -B-.
29. Fasten wire harness in plenum panel on right.
29.1. Place line in installation position -Arrow A- and insert rubber sleeve in plenum panel -Arrow B-.
29.2. Fix line and clip in bracket -Arrow C-.
29.3. Fasten line together with retaining clips on threaded bolt -Arrows D-.
29.4. Fit rubber seal in area -a- to the plenum panel. -Arrow E-.