porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 5979 > < Procedures|Page 5977
Page 99
background image

6. Connect line to threaded bolt (external power connection) -Arrow A- and tighten with the fastening nut -3-. Tightening torque: 6 ftlb..

7. Close cap -Arrow B-.
8. Connect line to threaded bolt -Arrow C- and tighten with the fastening nut -2-. Tightening torque: 6 ftlb..
9. Close cap -Arrow D-.

10. Place lines (upper side member) in installation position -Arrows A-and close clips -Arrows B- until locking tabs are felt to engage.

11. Fasten line with a new tie-wrap -C-.
12. Place line (under headlight mounting) in installation position -Arrows A- and close clips -Arrows B- until locking tabs are felt to engage.

Procedures|Page 5979 > < Procedures|Page 5977