porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Relays and Modules - Power and Ground Distribution > < Removing and Installing Cut-Off Relay|Page 5465
Page 3
background image

3. Close covers -Arrows A- until locking tabs are felt to engage -B-.

4. Push in connector -Arrow A- until the locking tabs -B- are felt to engage.

Install auxiliary battery

Relays and Modules - Power and Ground Distribution > < Removing and Installing Cut-Off Relay|Page 5465