Cayenne (9PA) V6-3.2L (2006)
A-pillar
8. Thread line through A-pillar -Arrow A- (if necessary, fasten line to a tie-wire and pull it through the A-pillar).
9. Fit ground straps together with twist lock on threaded bolt -Arrow B- and screw down with fastening nut -1-. Tightening torque: 6.5 ftlb.
B-pillar
10. Push lead through B-pillar to the outside.
A- & B-pillar
11. Push sockets into socket bracket -Arrows A- until locking tabs are felt to engage -B-.
12. Push in connector holder -Arrow C- until locking tabs -D- are felt to engage.
13. Push in connectors -Arrow A- until locking tabs -B- are felt to engage.