Cayenne (9PA) V6-3.2L (2006)
2. Fit ground strap (next to relay carrier in plenum panel E-box) together with twist lock -a- on the threaded bolt -Arrow C- and secure with fastening
nut -1-. Tightening torque: 6.5 ftlb..
3. Place line (under relay carrier in plenum panel E-box) in installation position -Arrows A- and close clips -Arrows B-.
4. Push connector onto alarm siren -Arrows C- until locking tabs -D- are felt to engage.
5. Push connector onto left air flow sensor -Arrow A- until locking tabs -B- are felt to engage.