Cayenne (9PA) V6-3.2L (2006)
Fastening screws for control unit
Note: Screws which are tightened with a torque angle must be replaced with new ones.
2. Install electro hydraulic control unit and screw in new fastening screws -arrows-. Initial Tightening 6 ft. lbs. Final tightening 90 °
Cable plug for output shaft inductive pickup
3. Plug in cable plug -2- for output shaft speed inductive pickup. -arrow-
4. Install wire set for sensors through opening in the housing.